|
|

|
|
Job Reference: VP49968T
The Hyderabad Metro Rail Project in Andhra Pradesh, India is a 71km public transport system consisting of three corridors at an estimated cost of USUSD 3billion. The tentative start date for the project is January 2009 with a completion time of 60 months. The project has been taken up on a DBFOT basis in PPP mode and will be overseen by a highly competent independent engineering consultant. The following qualified and experience professionals are invited to submit an application to take part in this innovative project in India:
Team Leader
Education: Graduate/Post Graduate in Engineering
Commitment:: 60 months
Experience: You should have up to 25 years of experience in the engineering field and should have been responsible for railways planning, designing...
| Type : | Permanent | | Location : | Hyderabad (India) | | Salary : | Negotiable | | Posted : | 11/11/2008 | |
|
|
 more details apply now |
|
|
|

|
|
Job Reference: VP50117T
An International Engineering Consultancy requires a Hydro Power Head to be based in Delhi. This is an excellent opportunity for a hydro power professional with less then 15yrs experience to gain further international experience with a leading MNC. This permanent position reporting to the COO and CMD will involve providing consultancy services on projects of 100+MW and has the potential for expansion to other international locations.
Requirements:
Civil Engineering background
Prefer previous experience with SMEC, JP Ventures, Colenco
Hydro Power design experience
Must be competent in details engineering, site selection, feasability reports, due diligence studies and valuation of offers.
Skills:
Civil Engineering background
| Type : | Permanent | | Location : | New Delhi (India) | | Salary : | Negotiable | | Posted : | 12/11/2008 | |
|
|
 more details apply now |
|
|
|

|
|
Job Reference: VP50035T
TEAM LEADER / SENIOR HIGHWAY ENGINEER
This is the senior most position and the expert engaged as the team leader shall be responsible for reviewing the entire Project preparation and implementation activities of the Concessionaire. He shall check all the Designs being prepared by the Concessionaire, ensure execution of works on site as per specification and standards, and continuously interact with the NHAI and the Concessionaire. He shall undertake Project site visits and shall guide, supervise, coordinate and monitor the work of other experts in his team as well as those of the Concessionaire. The candidate should have a proven record of supervising, organising and managing of Project preparation and construction of highway projects of large magnitudes, as de...
| Type : | Permanent | | Location : | Delhi (India) | | Salary : | Negotiable | | Posted : | 11/11/2008 | |
|
|
 more details apply now |
|
|
|

|
|
Job Reference: VP49970T
The Hyderabad Metro Rail Project in Andhra Pradesh, India is a 71km public transport system consisting of three corridors at an estimated cost of USUSD 3billion. The tentative start date for the project is January 2009 with a completion time of 60 months. The project has been taken up on a DBFOT basis in PPP mode and will be overseen by a highly competent independent engineering consultant. The following qualified and experience professionals are invited to submit an application before 20/11/09 to take part in this innovative project in India:
Railway Alignment and Track Expert
Education: Graduate in Engineering
Commitment:: 8 months
Experience: You should have up to 20 years of experience in the engineering field and should have been responsible for plan...
| Type : | Permanent | | Location : | Hyderabad (India) | | Salary : | Negotiable | | Posted : | 11/11/2008 | |
|
|
 more details apply now |
|
|
|

|
|
Job Reference: VP49969T
The Hyderabad Metro Rail Project in Andhra Pradesh, India is a 71km public transport system consisting of three corridors at an estimated cost of USUSD 3billion. The tentative start date for the project is January 2009 with a completion time of 60 months. The project has been taken up on a DBFOT basis in PPP mode and will be overseen by a highly competent independent engineering consultant. The following qualified and experience professionals are invited to submit an application before 20/11/09 to take part in this innovative project in India:
Railway Alignment and Track Expert
Education: Graduate in Engineering
Commitment:: 8 months
Experience: You should have up to 20 years of experience in the engineering field and should have been responsible for plan...
| Type : | Permanent | | Location : | Hyderabad (India) | | Salary : | Negotiable | | Posted : | 11/11/2008 | |
|
|
 more details apply now |
|
|
|

|
|
Job Reference: VP49967T
The Hyderabad Metro Rail Project in Andhra Pradesh, India is a 71km public transport system consisting of three corridors at an estimated cost of USUSD 3billion. The tentative start date for the project is January 2009 with a completion time of 60 months. The project has been taken up on a DBFOT basis in PPP mode and will be overseen by a highly competent independent engineering consultant. The following qualified and experience professionals are invited to submit an application before 20/11/09 to take part in this innovative project in India:
Railway Alignment and Track Expert
Education: Graduate in Engineering
Commitment:: 8 months
Experience: You should have up to 20 years of experience in the engineering field and should have been responsible for plan...
| Type : | Permanent | | Location : | Hyderabad (India) | | Salary : | Negotiable | | Posted : | 11/11/2008 | |
|
|
 more details apply now |